Expression of Interest for Asociation as Master Consultants for the Preparation and Implementation of Zonal Development Plans and/or Area Development Schemes
Start Date: Mon, 9th Oct, 2017 | End Date: Mon, 20th Nov, 2017Issued by: Patna Metropolitan Area Authority
Request for Proposal development of Lake Zone III including Lake Front Road, Water body, Public realm, Streetscapes, Beautification, Landscaping and Infrastructure & Utilities in Bhubaneswar’s Town Centre District under Smart Cities Mission on Engineering, Procurement and Construction (EPC) Mode
Start Date: Tue, 17th Oct, 2017 | End Date: Tue, 21st Nov, 2017Issued by: Bhubaneswar Smart City Limited
Request for Proposal for Selection of Developer for Installation of Smart Parking Solution with Operation & Maintenance of underground parking’s at Jhandi Park, Lalbagh, Dayanidhan Park, Lalbagh and Jhandewala Park, Aminabad in Lucknow on Design, Build, Finance, Operate and Transfer (DBFOT) basis under PPP mode
Start Date: Wed, 25th Oct, 2017 | End Date: Tue, 21st Nov, 2017Issued by: Lucknow Smart City Limited
Request for Proposal (RFP) for Construction of Smart Park with Operation and Maintenance of 5 Years with a Defect Liability Period of Two Years in Faridabad City under the Smart Cities Mission (SCM)
Start Date: Mon, 16th Oct, 2017 | End Date: Tue, 21st Nov, 2017Issued by: Faridabad Smart City Limited
Request for Proposal for Design Engineering, Construction, Supply, Installation, Testing, Erection & Commissioning of Fully Automated Compact Sewage Treatment Plant Based on Sequencing Batch Reactor (SBR) Technology with successive Operation and Maintenance for the period of 10 years at 2 locations in Lucknow
Start Date: Tue, 24th Oct, 2017 | End Date: Wed, 22nd Nov, 2017Issued by: Lucknow Smart City Limited
Request for proposal for development of Badkhal road (Badkhal mor, km 0/000 to by pass road, km 1/670) from two lane to six lane smart road along with underground utilities including with defect liability period of two years and operation & maintenance of 5 years in Faridabad city.
Start Date: Wed, 18th Oct, 2017 | End Date: Wed, 22nd Nov, 2017Issued by: Faridabad Smart City Limited
Request for Proposal for Design, Supply, Installation. Testing and Commissioning of national Flag including Illumination of Flag Post at Gandhi Mandap, Sarania Hills in Guwahati on Design, Build and Operate Basis with Operation and Maintenance period of one Year
Start Date: Wed, 8th Nov, 2017 | End Date: Wed, 22nd Nov, 2017Issued by: Guwahati Smart City Limited
Request for Proposal for Appointment of Project Management Unit for Pimpri-Chinchwad Smart City Mission
Start Date: Fri, 13th Oct, 2017 | End Date: Thu, 23rd Nov, 2017Issued by: Pimpri-Chinchwad Smart City Limited
Tender for Work for 24 x 7 Water Supply System under Smart City Mission in ABD area of Vadodara Municipal Corporation including Refurbishment of existing network in part area and New Distribution Network in Part area. The works also includes Civil, Electromechanical, Instrumentation, SCADA, Household connections, Consumer water meter fittings and Operation and Maintenance for a period of 10 years
Start Date: Mon, 6th Nov, 2017 | End Date: Fri, 24th Nov, 2017Issued by: Vadodara Smart City Development Limited
Request for Proposal for Consultancy Services for Preparation of DPR for Tunnel/Subway from Sanganeri Gate to Jorawar Singh Gate in Jaipur
Start Date: Mon, 16th Oct, 2017 | End Date: Fri, 24th Nov, 2017Issued by: Jaipur Smart City Limited
Request for Quotation for Providing network service of required bandwidth within Visakhapatnam City FOR System Integrator Project under Smart City Mission
Start Date: Fri, 10th Nov, 2017 | End Date: Sat, 25th Nov, 2017Issued by: Greater Visakhapatnam Smart City Corporation Limited
Request for Proposal for Selection of Project Management Consultant to Design, Develop, Manage and Implement Smart City Projects Under Smart City Mission in Karimnagar, Telangana
Start Date: Wed, 1st Nov, 2017 | End Date: Mon, 27th Nov, 2017Issued by: Karimnagar Smart City Corporation Limited
RFQ-cum-RFP for Designing, Setting – Up, Operating & Maintaining of Smart Bus Stops & Smart Public Toilets in the Area Based Development of Visakhapatnam Smart City on Public Private Partnership Basis
Start Date: Fri, 13th Oct, 2017 | End Date: Tue, 28th Nov, 2017Issued by: Greater Visakhapatnam Smart City Corporation Limited
Request for Proposal for Selection of Master System Integrator for Implementation of Intelligent Transport Management System Adaptive Traffic Control System, Smart Poles, Solid Waste Management, Kiosk and Way Finder Signboards and Integrated Command and Control Centre (ICCC) in Gandhinagar City
Start Date: Mon, 23rd Oct, 2017 | End Date: Tue, 28th Nov, 2017Issued by: Gandhinagar Smart City Development Limited
Request for Proposal for Riverfront and Park Development Jawahar Marg to Chandrabhaga Bridge at Indore
Start Date: Sat, 28th Oct, 2017 | End Date: Wed, 29th Nov, 2017Issued by: Indore Smart City Development Limited
Bid Document for Construction of Foot Over Bridge (FOB) Joining Promenades of River Sabarmati between Ellis Bridge and Sardar Bridge on the Sabarmati Riverfront in Ahmedabad
Start Date: Mon, 23rd Oct, 2017 | End Date: Wed, 29th Nov, 2017Issued by: Ahmedabad Municipal Corporation
Request for proposal For Setting up of Water ATM for Safe Drinking Water including Designing, financing, constructing / installing, operating and maintaining of Water ATMs and vending of water from Water ATMs at Public Places through Public Private Partnership (PPP) at designated locations under “Smart City Mission” at Gandhinagar City.
Start Date: Mon, 30th Oct, 2017 | End Date: Wed, 29th Nov, 2017Issued by: Gandhinagar Smart City Development Limited
Request for Proposal for appointment of ICT consultant for preparation of detailed project report and providing supervision services for implementation of “Pan City Solution” under Smart Cities Mission in Kalyan - Dombivli
Start Date: Tue, 7th Nov, 2017 | End Date: Wed, 29th Nov, 2017Issued by: Smart Kalyan-Dombivli Development Corporation Limited
Request for Proposals under Two-Bid system from eligible agencies for Selection of Master System Integrator (MSI) for Implementation of Command Control and Communication Centre (C4) under Smart City Mission in Ranchi through e-procurement system.
Start Date: Thu, 12th Oct, 2017 | End Date: Thu, 30th Nov, 2017Issued by: Ranchi Smart City Corporation Limited
Request for Proposal for Appointment of Contractor for Construction and Re-asphalting of Alternate Road behind H.D. High School (Khind Road) & Mangalvedhekar Institute to VIP Road , Solapur under Smart Cities Mission
Start Date: Fri, 10th Nov, 2017 | End Date: Tue, 5th Dec, 2017Issued by: Solapur City Development Corporation Limited
Port Blair Municipal Council invites proposal for Supplying and Commissioning of Software Solution for Automation of Building Plan Approval System in Port Blair Municipal Council
Start Date: Fri, 20th Oct, 2017 | End Date: Tue, 5th Dec, 2017Issued by: Port Blair Municipal Council
Request for Proposal for Selection of System Integrator for Implementation of Pan-City ICT Components for Warangal Smart City
Start Date: Wed, 15th Nov, 2017 | End Date: Wed, 6th Dec, 2017Issued by: Greater Warangal Smart City Corporation Limited
Bidding Document for Procurement of Works for Improvement and Upgradation of Intersections in Varanasi
Start Date: Mon, 6th Nov, 2017 | End Date: Wed, 6th Dec, 2017Issued by: Varanasi Smart City Limited
Request for Proposal for Urban Revitalization of Roads and Junction Improvement Project in Varanasi
Start Date: Mon, 6th Nov, 2017 | End Date: Wed, 6th Dec, 2017Issued by: Varanasi Smart City Limited
Request for Proposal for selection of agency to design, procure, install, operate and maintain Public Bicycle Sharing System in Bhubaneswar
Start Date: Fri, 10th Nov, 2017 | End Date: Thu, 7th Dec, 2017Issued by: Bhubaneswar Smart City Limited
Request for Proposal for Redevelopment and Landscaping of Four Smart Parks including Operation and Maintenance for 5 years and Defect Liability Period for 1 Year in Varanasi under the Varanasi Smart City Mission
Start Date: Mon, 6th Nov, 2017 | End Date: Thu, 7th Dec, 2017Issued by: Varanasi Smart City Limited
Request for Proposal for Selection of Project Management Consultant (PMC) to Design, Develop, Manage and Implement Smart City Projects Under Smart City Mission in Jammu
Start Date: Fri, 3rd Nov, 2017 | End Date: Sat, 9th Dec, 2017Issued by: Jammu Smart City Limited
Request for Proposal for Selection of Project Management Consultants to design, Develop, Manage and Implement Smart City Projects under Smart City Mission in Srinagar
Start Date: Mon, 30th Oct, 2017 | End Date: Sat, 9th Dec, 2017Issued by: Srinagar Smart City Limited
Request for Proposal for the appointment of technical consultant for preparation of design and detailed project report with construction supervision for 2.5 km of waterfront development under Smart Cities Mission in Kalyan-Dombivli
Start Date: Tue, 14th Nov, 2017 | End Date: Fri, 15th Dec, 2017Issued by: Smart Kalyan-Dombivli Development Corporation Limited
Request for Proposal for the appointment of technical consultant for preparation of design and detailed project report with construction supervision for complete street network under Smart Cities Mission in Kalyan-Dombivli
Start Date: Tue, 14th Nov, 2017 | End Date: Fri, 15th Dec, 2017Issued by: Smart Kalyan-Dombivli Development Corporation Limited
Request for Proposal for Construction of 4 Lane Flyover from Shanti Chowk Km 0+691 to Gentyal Chowk on NH-9 Km 3+519 including ramps, service road, footpath over RCC Rectangular drain, cycle track over RCC Utility ducts in Solapur City Limit in the State of Maharashtra on EPC mode.
Start Date: Tue, 7th Nov, 2017 | End Date: Mon, 8th Jan, 2018Issued by: National Highways Authority of India