The objective of this proposal is to provide a structure for EV charging infrastructure rollout in the Gurgaon-IGI-South Delhi-Noida corridor. This proposalis expected to make the actual rollout easier and faster and serve as a pilot study for deployment. The proposal (supported by the planning tool) is based on a five-step process; 1) kickoff, 2) formation of "master list" of locations, 3) streamlining and timing, 4) documentation and 5) wrap-up. The planning was done is five separate sub-plans of which four were based on the type of collaborating organizations and one (IGI airport) on a geographical location